Palmer College
Challenge & Requirements
The challenge of this project was construction delays which created a very difficult on-time opening date.
Solution
Push Pedal Pull worked with the construction contractors to install the equipment while the facility was still under construction.
Results
A stunning premier college recreation center that is a great student recruiting tool!
Equipment
- Precor P82 Cardio
- Precor Queenax
- Precor Discovery Selectorized
- Precor Discovery Plate Load
- Legend Racks/benches
- Torque X-Rack
- Troy Urethane Dumbbells/Plates
- Stairmaster Stepmills
Location
Davenport, Iowa